Photocopying and Scanning is not working at Westdale Branch. We aim to fix it as soon as possible.
Daily print balances for black and white and colour printing change January 2, 2026. The new daily print balance is 40 cents. Members receive four free black and white copies or two free colour copies.
Large format and vinyl printing pricing also change on January 2. Visit https://www.hpl.ca/makerspaces for updates.
Bookmobile is off the road from December 25-27, December 31, and January 1st. Visit www.hpl.ca/bookmobile for our Holiday Schedule.
Due to the setup for the Noon Hour Concert, the Fourth Floor at Central Library will be closed on Friday, January 2. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 have spaces to work and study.
All branches close on Thursday January 1 for New Years Day. This includes branches with Extended Access.
All branches close on Friday, December 26, 2025 for Boxing Day . This includes branches with Extended Access.
All HPL Branches close early on Wednesday, December 24 at 1pm. All locations are also closed on Christmas Day, Thursday, December 25, and Boxing Day, Friday, December 26. Visit www.hpl.ca/hours for our Holiday Schedule.
All HPL Branches close early on Wednesday, December 31 at 1pm. All locations are also closed on New Year's Day, Thursday, January 1st. Regular service hours resume on Friday, January 2. www.hpl.ca/hours
All branches close on Thursday, December 25, for Christmas. This includes branches with Extended Access.
All branches close on Sunday, December 28, 2025. This includes branches with Extended Access.
Branch Study Halls are paused Friday, December 19, 2025 through Monday, January 5, 2026. Central Library Study Hall hours resume Spring 2026.
www.hpl.ca/study-halls
Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items.
Mountain Steps
There were originally 7 sets of city-built stairs up the escarpment. The original locations were Chedoke Park, Dundurn Street, James Street, John Street, Ferguson Avenue, Wentworth Street, and Ottawa Street.
Currently there are 5 sets of stairs up the escarpment in addition to a privately-built set of steps. After the Jolley Cut was rebuilt, the John and Ferguson steps disappeared and their remnants were incorporated into the walkways at Sam Lawrence Park.
Chedoke
These steps connect the West Mountain to the lower west city, coming close to the front door of the Chedoke Civic Golf Course clubhouse. There are 289 steps.
Dundurn
The original Dundurn wooden steps were replaced in the 1990s by steel steps. There are 326 steps.
James
The original James Street wooden steps were replaced in 1987. The stairs originate at Southam Park on the mountain at the top of the Claremont Access. There are 227 steps.
Wentworth
The original wooden steps built in 1903 consisted of 6” to 7 ¼” risers. The stringers rested on cedar posts sunk 4-7’ in the ground. The original staircase had 570 steps. After a rock slide in March of 1983 they were replaced with metal steps just east of the position of the original steps and they now follow the path of the old East End Incline Railway. There are 498 steps.
Kenilworth
The Kenilworth steps connect the East Mountain to the Escarpment Rail Trail/Bruce Trail, and continue down to the Rosedale area of Hamilton. There are 228 steps.
Before the city completed construction on the Kenilworth stairs, a privately built set of steps named Uli’s Steps connected the upper and lower city. These steps were built as a retirement project by a Hamiltonian named Uli who spent two years on the project. They have 305 steps.