Red Book Search Is Currently Unavailable

The Red Book search is not working. We aim to restore the service soon. Thank you for your patience.

All Branches and Bookmobile Stops
Published:
Thursday, October 30, 2025 - 3:45pm
Ancaster Branch Without Power

Ancaster Branch is experiencing a power outage.  There are no accessible bathrooms, elevator, internet, access through the back door, or public computers.  There is limited lighting. The branch is open with limited services.  

1
Published:
Thursday, October 30, 2025 - 2:45pm
Barton Branch Accessible Washroom Out of Order

The accessible washroom at Barton Branch is not working. We aim to get it fixed quickly.

Published:
Thursday, October 30, 2025 - 1:30pm
Bookmobile Service Modification

The Greencedar (295 Greencedar Drive, 4-5 pm) visit is cancelled today, Tuesday, October 28, due to vehicle maintenance. Regular service is expected to return next week. Thank you for your understanding.

All Branches and Bookmobile Stops
Published:
Tuesday, October 28, 2025 - 1:00pm
Kenilworth Branch Reopening

The Kenilworth Branch has reopened today, Monday, October 27. Please note that there is limited parking, and noise disruptions may occur this week as the final touches are made to the renovations. Thank you for your understanding.

1
Published:
Monday, October 27, 2025 - 3:00pm
Central Library - Fourth Floor Closure

The 4th Floor is closed on Thursday, October 30 from 4-8pm for a special event. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 are available with study and work spaces. 

1
Affected Branch: Central Library
Published:
Monday, October 27, 2025 - 3:00pm
Delayed Branch Openings 

The following locations have upcoming delayed openings due to Staff training drills. 

Thursday, October 30
Parkdale Branch, 9:30am

Monday November 3
Saltfleet Branch, 9:30am 

Friday, November 7
Terryberry Branch, 10am

Monday, November 10 
Concession Branch, 10am

Thursday, November 13
Binbrook Branch, 10am

Friday, November 14
Valley Park Branch, 10am

You may visit nearby Branches for your library needs. www.hpl.ca/hours

All Branches and Bookmobile Stops
Published:
Tuesday, October 7, 2025 - 2:00pm
Replacement and Damage Fees

Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items. 

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm

History of Gore Park

Concrete bunker buildings demolished
Concrete bunker buildings demolished

Council voted to tear down the buildings and start over, hiring a registered landscape architect to oversee the job. The Chief Administrative Officer defended his as “a money-saving thing". Council started from scratch and hired the Toronto firm of Moorhead, Fleming, Corban and McCarthy in January 1984 for $54,000 to redesign the park. Their plan called for lots of grass, flowers and trees with a small fountain. On February 29, 1984 council unanimously endorsed the plan with a proviso that the location of the fountain be reviewed (55). The Victorian fountain proposed was re-designed as a polished granite block one-metre square with water bubbling up through the middle. One alderman said that it would "turn into a urinal for the winos who hang around the park" and another said, "(t)his isn't a fountain, it's a big hunk of stone". Nevertheless, the fountain was approved the same day that the estimated losses incurred in the Gore Park fiasco were announced - $715,000 (56).

Gore Park renovations begin again
Gore Park renovations begin again

In November of 1984 the renovations to the park and adjoining roadway were completed at a cost of $2.5 million. Three months later a whole section of the interlocking bricks had heaved up and was, in the words of one alderman, "a hell of a mess" (57) Consultants were hired at a cost of $5,000 to determine what went wrong with the bricks. Their report concluded the "undersized interlocking bricks were used, sub-drains were never installed, contract drawings failed to show needed work, road design was inadequate, road slope was inadequate, inferior materials were used for a road base and the road was opened before it was ready to bear traffic” (58). The cost for re-doing it correctly so that the problem would not reoccur was $87,500 (59), Instead of following the advice of the consultants, council voted to take on a cheaper half-price plan to fix the damage. Their share would be $7,000, which had escalated in one week to $15,000.

Gore Park renovated
Gore Park renovated

The arrival of the 21st century has led to more changes for the Gore. The Gore is no longer a transit hub for the city with the arrival of the Macnab Transit Terminal in 2011. Recent renovations to the Gore have led to a more pedestrian-friendly look for Hamilton's first park.