Printing is not working at Ancaster Branch. We aim to fix it as soon as possible.
The accessible washroom at Sherwood Branch is not working. We aim to get it fixed quickly.
Starting Monday, April 27 until May 4, non-partner community organizations are encouraged to participate in a short survey. HPL would like to learn how the Library Card Access Pilot Project and the toxic drug crisis in general affect non-partner organizations. Please note that the survey is not anonymous. Start now at www.hpl.ca/non-partner-survey.
Due to software maintenance, HPL library's catalogue, online services and library accounts will not be available between 9am and 7pm on Monday, May 18. Thank you for your patience.
Due to Staff training, Central Library will close from 11am to Noon on Tuesday, May 5. You may visit Locke and Barton Branches as the next nearest locations for your library needs. Thank you for your patience.
Renovations are expected to be completed by May 7. Construction repairs and noise may impact your next visit. Thank you for your understanding.
Due to Staff training, Mount Hope Branch will have a delayed opening of 2 pm on Monday, May 4. You may visit Turner Park Branch as the next nearest location for your library needs. Thank you for your patience.
Renovations are currently underway for the 2nd floor Central Children's Area. Programs are still being offered as scheduled and there is a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Construction is expected to be completed by late Spring. Thank you for your patience during this time.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
Red Hill Creek Expressway Books: 1970-1975
Background Reports Red Hill Expressway Consolidated Hearing - Record Number 390 Geometric Design Implications and Vehicle Noise
Highway Research Board. National Research council. National Academy of Sciences. National Academy of Engineering.
[1972]
CA3ONHWAO5 84 B163
Hamilton Mountain and Redhill Creek Transportation Corridor: Submission respecting Mountain Section
Hamilton, Ontario. Board of Control
1972
CA4ONHBLA15 72 H15
Submission by the City of Hamilton Board of Control Respecting the Mountain Section Hamilton Mountain and Red Hill Creek Transportation Corridor
Hamilton, Ontario. Board of Control
1972
CA4ONBLA15 72 S73
Trucks in the City of Hamilton. Hamilton Truck Origin and Destination Study. A Report on the Study and Analysis of Existing Truck Movements in the City of Hamilton
Prepared for the Transportation and Traffic Committee of the City of Hamilton by the Department of Traffic and the Ontario Ministry of Transportation and Communications
July 1973
R388.41324 HAM CESH
Technical Report Proposed Red Hill Creek Expressway
Hamilton Region Conservation Authority
1973
CA2ONER59 73 T26
Red Hill Creek Expressway Review. An analysis of alternative solutions. prepared for the city-provincial technical advisory committee
Route Projects Planning Office, Ministry of Transportation and Communications
Prepared by: S.C.J. Radbone
January 1975
R388.40971352 RED CESH
CA2ONDT 75 R23
Report on Redhill Creek Flood Plain Mapping for the Hamilton Regional Conservation Authority
N.M. Dillon Ltd.
March 1975
R627.40971352 REP CESH
Redhill Creek. Watershed Management Study
Hamilton Region Conservation Authority
M.M. Dillon Ltd.
June 1975
R627.40971352 RED CESH
Red Hill Creek Expressway Review: an Analysis of Alternative Solutions
Ontario. Ministry of Transportation and Communications
1975
CA2ONDT 75 R23
Regional roads study: progress report No. 2
Regional Roads Coordinating Committee
1975
R388.40971352 REG CESH








