The HPL App and HPL Catalogue are not working. We aim to fix it quickly. Thank you for your patience.
Heat Warning for the City of Hamilton.
Significant heat and humidity will arrive on Friday July 11. Heat Warnings stay in effect until they are cancelled or escalated to an Extended Heat Warning.
For information about heat-related illnesses, cool place locations and reducing your risk, visit hamilton.ca.
Accessible Parking Spot not available. We are working to resolve the issue as soon as possible.
Filming will take place near the Locke Branch from July 13 to 16, which will impact traffic flow and parking. We apologize for the inconvenience.
- North side of Homewood Avenue between Lockes Street South and Kent Street
- North/South side of Stanley Avenue
- East side of Kent Street between Stanley Avenue and Homewood Avenue
The parking lot elevator at Terryberry Branch is not working. Members will need to use the accessible ramp at the Mohawk entrance and the inner elevator. We're working to get it fixed quickly.
Please note that the audio volume levels on our public computers are having issues. The estimated time of disruption is unknown at this time. Thank you for your patience.
The accessibility ramp at Mount Hope Branch is damaged. The handrail is not available. The ramp will not be available while being repaired. We aim to fix it quickly.
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH