Modified Bookmobile Service - September 15-18

Bookmobile has the following schedule modifications. Thank you for your patience. 

Monday, September 15

  • Mohawk College, 12-1pm - Cancelled

Tuesday, September 16

  • Greencedar, 4-5pm - Cancelled

Wednesday, September 17

  • Helen Detwiler - Changed to 11-11:30am

Thursday, September 18

  • Meadowlands - Changed to 3:30-4pm
  • Bennetto - Changed to 4:45-5:30pm
 
 
1
Affected Branch: Bookmobile
Nearest Branches: 
Published:
Friday, September 12, 2025 - 3:00pm
Replacement and Damage Fees Resume October 1st

To avoid a replacement or lost fee, please return library materials due October 1st or later within 28 days. Replacement fees are intended to encourage Members to return items on a timely basis so everyone in the community can enjoy them. 

https://www.hpl.ca/news/frequently-asked-questions

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm
SuperCrawl - Road Closures near Central Library

From Thursday, September 11, until 5 am on Monday, September 15, road closures for SuperCrawl will be in effect in and around James Street North from King to Wilson/York to Cannon to Barton Street. Additional closures will take place on King William, Rebecca, Vine, Mulberry, Colbourne and Murray Streets. If you are planning to visit Central Library over the next few days, we suggest taking HSR for a convenient route to downtown Hamilton. www.hpl.ca/central

1
Affected Branch: Central Library
Published:
Wednesday, September 10, 2025 - 10:30am
Central Library - Fourth Floor Temporary Closure

Central Library's Fourth Floor is closed on Tuesday, September 16, from Noon to 6 pm due to a special event. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 are available as study and work spaces. www.hpl.ca/central

1
Affected Branch: Central Library
Published:
Wednesday, September 10, 2025 - 10:00am
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 10)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1976-1979

Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study

Deleus Cather, Canada Ltd.

February 1978

R388.40971352 STU CESH

 

Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection

The Regional Municipality of Hamilton-Wentworth

July 1978

R388.40971352 HAM CESH Vol. 1

 

Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise

S.M. Taylor, S. Birnie, and F.L. Hall

Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada

Environment and Planning A, volume 10, pages 1377-1386

1978

CA3ONHWAO5 84 B1637

 

The effects of the Upper Ottawa street landfill on Redhill Creek

Ontario. Water Resources Assessment. Technical Support

Ministry of the Environment

1978

R628.1686713 On8 CESH

 

Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4

The Regional Municipality of Hamilton-Wentworth

January 1979

R388.40971352 HAM Vol. 2 CESH

 

Floodplain Analysis Red Hill Creek Valley

March 1979

R627.40971352 FLO CESH

 

Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation

May 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission

Regional Engineering Dept.

1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility

July 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council

July 18, 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4

The Regional Municipality of Hamilton-Wentworth

August 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives

Hamilton-Wentworth Regional Municipal Council

1979

CA3ONHWAO5 79 M52

 

Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee

Ministry of Transportation and Communications

1979

R388.40971352 RED CESH