Ancaster Branch - Temporary Closure, May 5-31

From Monday, May 5 to Saturday, May 31, the Ancaster Branch will be temporarily closed due to a roof and HVAC replacement. During this time, service hours will be available at the Morgan Firestone Arena, 385 Jerseyville Road West, Ancaster. The last day to pick up your Holds is Thursday, May 1st. Thank you for your understanding.

www.hpl.ca/ancaster

1
Published:
Wednesday, April 16, 2025 - 11:00am
All Branches Closed for Good Friday

All branches closed on Friday, April 18, 2025 for Good Friday. This includes branches with Extended Access.

All Branches and Bookmobile Stops
Published:
Friday, April 11, 2025 - 10:15am
All Branches Closed for Easter Sunday

All branches closed on Sunday, April 20, 2025 for Easter Sunday. This includes branches with Extended Access.

All Branches and Bookmobile Stops
Published:
Friday, April 11, 2025 - 10:15am
All Branches Closed for Easter Monday

All branches closed on Monday, April 21, 2025 for Easter Monday. This includes branches with Extended Access.

All Branches and Bookmobile Stops
Published:
Friday, April 11, 2025 - 10:15am
Central Library - Microfilm Machine

The digital microfilm machines at Central Library are not working. A single analog machine is available, but it doesn't print. We aim to have the digital devices repaired as soon as possible. We apologize for the inconvenience.

1
Affected Branch: Central Library
Published:
Thursday, April 10, 2025 - 3:30pm
Barton Branch - Roof Repair

Due to the ongoing roof repair project, noise and parking disruptions will continue until April 25. Thank you for your patience.

Published:
Tuesday, April 8, 2025 - 3:30pm
Sherwood Branch - Basement Renovation

The first phase of renovations will begin at the Sherwood Branch from April 10 to May 2. During this time, noise disruptions may occur throughout the branch due to a basement renovation. Parking, access to the building, and collections will not be affected. Thank you for your patience. www.hpl.ca/sherwood

Published:
Monday, April 7, 2025 - 8:30am
Phishing Scheme

Please be aware of online phishing attempts impersonating Hamilton Public Library and Library Staff. HPL does not solicit paid freelance opportunities through social media or other messaging applications. HPL does not request personal or banking information through social media or require financial compensation when reviewing job applications. Please report phishing schemes to communications@hpl.ca. If you think you are a victim of fraud, please call the Canadian Anti-Fraud Centre at 1-888-495-8501.

All Branches and Bookmobile Stops
Published:
Thursday, April 3, 2025 - 10:30am

Red Hill Creek Expressway Books: 1976-1979

Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study

Deleus Cather, Canada Ltd.

February 1978

R388.40971352 STU CESH

 

Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection

The Regional Municipality of Hamilton-Wentworth

July 1978

R388.40971352 HAM CESH Vol. 1

 

Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise

S.M. Taylor, S. Birnie, and F.L. Hall

Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada

Environment and Planning A, volume 10, pages 1377-1386

1978

CA3ONHWAO5 84 B1637

 

The effects of the Upper Ottawa street landfill on Redhill Creek

Ontario. Water Resources Assessment. Technical Support

Ministry of the Environment

1978

R628.1686713 On8 CESH

 

Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4

The Regional Municipality of Hamilton-Wentworth

January 1979

R388.40971352 HAM Vol. 2 CESH

 

Floodplain Analysis Red Hill Creek Valley

March 1979

R627.40971352 FLO CESH

 

Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation

May 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission

Regional Engineering Dept.

1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility

July 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council

July 18, 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4

The Regional Municipality of Hamilton-Wentworth

August 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives

Hamilton-Wentworth Regional Municipal Council

1979

CA3ONHWAO5 79 M52

 

Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee

Ministry of Transportation and Communications

1979

R388.40971352 RED CESH