Due to filming in the area, there will be production vehicles and various pieces of film equipment located on:
East side of Bay Street between King Street West and York Blvd.
South side King Street East between McNab and Bay Streets
Due to filming in the area, there will be production vehicles and various pieces of film equipment located on:
East side of Bay Street between King Street West and York Blvd.
South side King Street East between McNab and Bay Streets
The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.
Due to exterior pavement construction, the Study Hall (8pm-Midnight) on Thursday, April 16 is cancelled. Study Hall service resumes on Monday, April 20.
The back parking lot will not be accessible from 10 pm on April 16 to 10 pm on Friday, April 17. Thank you for your understanding.
Please note that there is higher than usual noise levels and odors due to renovations taking place this week. Thank you in advance for your patience.
The accessible washroom on the 1st floor at Terryberry Branch is not working. We aim to get it fixed quickly.
Due to Staff training, Mount Hope Branch will have a delayed opening of 2 pm on Monday, May 4. You may visit Turner Park Branch as the next nearest location for your library needs. Thank you for your patience.
The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Wednesday, April 15
Thursday, April 16
Tuesday, April 21
Friday, April 24
Tuesday, April 28
Wednesday, April 29
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH