From Tuesday, March 3, to Wednesday, March 4, filming will take place from 7am to 11pm at 1464 Centre Road. This may impact traffic flow in the surrounding area.
The Terryberry branch parking lot elevator is out of order. The branch is still accessible via the ramp to the Mohawk doors and then the elevator in the middle of the building. We're working to get it fixed quickly.
The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.
Renovation preparations are underway in anticipation of the March 2 start. Computer availability may be limited. Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches). Renovations are expected to wrap up by late Spring. Thank you for your patience.
Renovation preparations are underway in anticipation of the March 2 start. Starting the week of February 23, the 2nd Floor will be closed. The Children's collection will be temporarily available on the 1st Floor. Renovations are expected to wrap up by late Spring. Thank you for your patience.
Starting Tuesday, February 10, the First Floor Living Room will be unavailable due to renovation preparations. Study and work spaces are available on Floors 2-3.
Please note the Noon Hour Concert on Friday, February 13, will be held at Terryberry Branch instead.
Thank you for your patience.
Please note the following Bookmobile visit updates.
Thursday, February 19
Rockton (10:30am-11:30am) - Cancelled
Bennetto 5-5:30pm (instead of 4-5:30pm)
Wednesday, February 25
Swansea 10:00-10:30am - Cancelled
Helen Detwiler 11:00am-12:00pm - Cancelled
Warplane Museum 3:00-4:00pm - Cancelled
Friday, February 27
Winona 11:00am-12:00pm - Cancelled
Maplewood 2:30-4:00pm - Cancelled
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Effective Sunday, February 1, Sunday service hours at Central Library will be paused.
Sunday Hours will continue at Dundas, Red Hill, Terryberry, Turner Park, Valley Park and Waterdown Branches from 1-5pm.
Red Hill Creek Expressway Books: 1990-1996
Mountain East-West and North-South Transportation Corridor Project: Executive Summary Preliminary Design Investigation
Regional Municipality of Hamilton-Wentworth
1990
CA3ONHWAO5 90 M52
Red Hill Creek Expressway Project Progress Report
Regional Municipality of Hamilton-Wentworth. Dept. of Engineering
1990- (irregular)
CA3ONHWQ90 R23
Technical Report - The Red Hill Creek Four Lane Road
March 1994
[The Crombie Report]
R388.40971352 TEC CESH
CA3ONHWAO5 94 T26
Hamilton-Wentworth Plan
Ontario. Office of the Premier
1994
CA2ONPM 94 R22
Biological Inventory of the Red Hill Valley. prepared by the Hamilton Naturalist's Club
Hamilton Regional Conservation Authority
1995
R574.971352 BIO CESH
Red Hill Creek Expressway, North-South section: proposed assessment process
Regional Municipality of Hamilton-Wentworth, Transportation Dept.
February 1996
CA3ONHWL60 96 R23
Red Hill Creek Expressway. North-South section. Exemption order
Regional Municipality of Hamilton-Wentworth. Roads Dept., Transportation Group
May 1996
R388.40971352 RED CESH
CA3ONHWQ94 96 R23
Archaeological survey of the Redhill Creek Valley, City of Hamilton, Ontario
Mayer Heritage Consultants
1996
in cataloguing