PressReader is not working. We aim to restore the service soon. Thank you for your patience.
The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Tuesday, March 24
McMaster 3:30-4:30pm - Cancelled
Greencedar 4:30-5pm (instead of 4-5pm)
Wednesday, March 26
Rockton 10:30-11:30am - Cancelled
Meadowlands 3:30-4pm - Cancelled
Bennetto 5-5:30pm (instead of 4-5:30pm)
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
A Children's area activity table, including the children's computers at Concession Branch are unavailable due to a facility issue. We aim to fix them as soon as possible.
HPL's original phone number is back in service. Please call 905-546-3200. The 289-779-7588 number, created due to the 2024 cybersecurity incident, is also working.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Red Hill Creek Expressway Books: 1990-1996
Mountain East-West and North-South Transportation Corridor Project: Executive Summary Preliminary Design Investigation
Regional Municipality of Hamilton-Wentworth
1990
CA3ONHWAO5 90 M52
Red Hill Creek Expressway Project Progress Report
Regional Municipality of Hamilton-Wentworth. Dept. of Engineering
1990- (irregular)
CA3ONHWQ90 R23
Technical Report - The Red Hill Creek Four Lane Road
March 1994
[The Crombie Report]
R388.40971352 TEC CESH
CA3ONHWAO5 94 T26
Hamilton-Wentworth Plan
Ontario. Office of the Premier
1994
CA2ONPM 94 R22
Biological Inventory of the Red Hill Valley. prepared by the Hamilton Naturalist's Club
Hamilton Regional Conservation Authority
1995
R574.971352 BIO CESH
Red Hill Creek Expressway, North-South section: proposed assessment process
Regional Municipality of Hamilton-Wentworth, Transportation Dept.
February 1996
CA3ONHWL60 96 R23
Red Hill Creek Expressway. North-South section. Exemption order
Regional Municipality of Hamilton-Wentworth. Roads Dept., Transportation Group
May 1996
R388.40971352 RED CESH
CA3ONHWQ94 96 R23
Archaeological survey of the Redhill Creek Valley, City of Hamilton, Ontario
Mayer Heritage Consultants
1996
in cataloguing








