Modified Bookmobile Service - September 15-18

Bookmobile has the following schedule modifications. Thank you for your patience. 

Monday, September 15

  • Mohawk College, 12-1pm - Cancelled

Tuesday, September 16

  • Greencedar, 4-5pm - Cancelled

Wednesday, September 17

  • Helen Detwiler - Changed to 11-11:30am

Thursday, September 18

  • Meadowlands - Changed to 3:30-4pm
  • Bennetto - Changed to 4:45-5:30pm
 
 
1
Affected Branch: Bookmobile
Nearest Branches: 
Published:
Friday, September 12, 2025 - 3:00pm
Replacement and Damage Fees Resume October 1st

To avoid a replacement or lost fee, please return library materials due October 1st or later within 28 days. Replacement fees are intended to encourage Members to return items on a timely basis so everyone in the community can enjoy them. 

https://www.hpl.ca/news/frequently-asked-questions

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm
SuperCrawl - Road Closures near Central Library

From Thursday, September 11, until 5 am on Monday, September 15, road closures for SuperCrawl will be in effect in and around James Street North from King to Wilson/York to Cannon to Barton Street. Additional closures will take place on King William, Rebecca, Vine, Mulberry, Colbourne and Murray Streets. If you are planning to visit Central Library over the next few days, we suggest taking HSR for a convenient route to downtown Hamilton. www.hpl.ca/central

1
Affected Branch: Central Library
Published:
Wednesday, September 10, 2025 - 10:30am
Central Library - Fourth Floor Temporary Closure

Central Library's Fourth Floor is closed on Tuesday, September 16, from Noon to 6 pm due to a special event. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 are available as study and work spaces. www.hpl.ca/central

1
Affected Branch: Central Library
Published:
Wednesday, September 10, 2025 - 10:00am
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 10)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1998

Red Hill Creek Expressway: north-south section: briefing sessions April 1, 1998 : stormwater management and creek realignment

Video

1998

Sherwood Library

 

Red Hill Creek Expressway: north-service section: briefing sessions April 7, 1998: site contamination and vegetation/wildlife

Video

1998

Sherwood Library

 

Red Hill Creek Watershed Action Plan: first generation plan: final draft

Regional Municipality of Hamilton-Wentworth

April 1998

CA3ONHWAO5 98 R246

 

Red Hill Creek Watershed Action Plan: compendium of actions

Regional Municipality of Hamilton-Wentworth

April 1998

CA3ONHWAO5 98 R245

 

Red Hill Creek Expressway North-South Section: impact assessment and design process: draft summary report: Vol. 2

Regional Municipality of Hamilton-Wentworth

July 1998

CA3ONHWAO5 98 R231

 

Air quality assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 T33D

 

From Mountain to lake: the Red Hill Creek Valley

edited by Walter G. Peace

Conserver Society of Hamilton and District

1998

R971.352 FRO CESH

 

Red Hill Creek Expressway: Phase 1 Environmental Site Assessment: draft for discussion

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R244D

 

Red Hill Creek Expressway: Phase 2 Environmental Investigation: draft for discussion

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R245D

 

Red Hill Creek Expressway North-South Section: Executive Summary

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R250E

 

Red Hill Creek Expressway Impact Assessment: Terrestrial Resources: Technical Report

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R246

 

The Red Hill Creek Expressway (North-South Section) Impact Assessment: Regional Municipality of Hamilton-Wentworth, Ontario: Summary Report of the Cultural heritage Resource Assessment

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R247

 

Red Hill Creek Expressway (North-South Section) and Q.E.W. interchanges (Red Hill Creek Expressway and Burlington Street

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 R23E

 

Red Hill Creek Expressway / QEW interchange review: integration model - traffic operations analysis

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 R23Q

 

Thermal dynamics impact assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 T32D

 

Traffic noise impact assessment Red Hill Creek Expressway North-South Section: Hamilton, Ontario: draft

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 T34D

 

Vehicle air emissions inventory North-South Section: Red Hill Creek Expressway: Hamilton, Ontario: draft

Regional Municipality of Hamilton-Wentworth

1998

CA3ONHWAO5 98 V35D