Bookmobile Service Modifications

The following Bookmobile visits have been cancelled today, Tuesday, November 4. Service is expected to resume next week.

  • Riverdale (150 Violet Drive), 11am-12pm - Cancelled
  • McMaster University, 3:30pm-4:30pm - Cancelled
1
Affected Branch: Bookmobile
Nearest Branches: 
Bookmobile Stop: 
Published:
Tuesday, November 4, 2025 - 11:30am
Dundas Branch Network Unavailable

Wifi disruption due to Wi-Fi Upgrades at the Dundas Branch on Nov 4th. We aim to resolve this issue as quickly as possible.

1
Published:
Monday, November 3, 2025 - 5:15pm
Concession Branch and Sherwood Branch Network Unavailable

Wi-Fi disruption due to Wi-Fi Upgrades at Concession Branch and Sherwood Branch on Nov 6th. We aim to resolve this issue as quickly as possible.

Published:
Monday, November 3, 2025 - 12:15pm
Waterdown Branch Network Unavailable

Wifi disruption due to Wi-Fi Upgrades at Waterdown Branch on Nov 4th. We aim to resolve this issue as quickly as possible.

1
Published:
Monday, November 3, 2025 - 9:45am
Delayed Branch Openings 

The following locations have upcoming delayed openings due to Staff training drills. 

Friday, November 7
Terryberry Branch, 10am

Monday, November 10 
Concession Branch, 10am

Thursday, November 13
Binbrook Branch, 10am

Friday, November 14
Valley Park Branch, 10am

Monday, November 24
Mount Hope, 2pm

Thursday, November 27
Stoney Creek, 10am

You may visit nearby Branches for your library needs. www.hpl.ca/hours

All Branches and Bookmobile Stops
Published:
Tuesday, October 7, 2025 - 2:00pm
Replacement and Damage Fees

Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items. 

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm

Red Hill Creek Expressway Books: 2000-

The Red Hill Valley Program newsletter

City of Hamilton, 2002-

R388.10971352 RED

 

Red Hill Creek Expressway, North-South section: draft report, King’s Forest Golf Course impact assessment study

Prepared by Graham Cooke & Associates

2002

R388.40971352 GRA

 

A stream network inventory, fluvial geomorphologic assessment, impact assessment, and preliminary natural channel design of Red Hill Creek: prepared for the City of Hamilton

Prepared by Water Regime Investigations and Simulations Ltd.

2003

R551.4420971352 WAT

 

Red Hill Valley Project public consultation report

Prepared by Lura Consulting

2003

R388.40971352 LUR

 

The Red Hill Valley Project: impact assessment and design process summary report

City of Hamilton

2003

R388.40971352 HAM

 

The Red Hill Valley Project land use assessment report: prepared for the City of Hamilton

Prepared by Dillon Consulting

2003

R388.40971352 DIL

 

Red Hill Valley Project landscape management plan: [draft]

Prepared by Envision, the Hough Group...[et al]

2003

R713.0971352 ENV

 

Red Hill Creek Expressway, North-South section: snowdrifting assessment

Prepared by Rowan Williams Davies & Irwin, Inc.

2003

R388/40971352 ROW

 

Red Hill Creek Expressway, North-South section: traffic noise impact assessment

Prepared by Rowan Williams Davies & Irwin, Inc.

R388.40971352 ROW

 

Red Hill Creek Expressway, North-South section: air quality assessment

Prepared by Rowan Williams Davies & Irwin, Inc.

2003

R363.7392 ROW

 

Red Hill Creek Expressway, North-south section: vehicle air emissions inventory

Prepared by Rowan Williams Davies & Irwin, Inc.

2003

R363.7392 ROW

 

Red Hill Creek Expressway, North-south section: thermal dynamics impact assessment

Prpared by William Davies & Irwin, Inc.

2003

R551.660971352 ROW

 

Red Hill Creek Expressway, North-South section: post-construction ambient air quality monitoring for Lincoln Alexander Parkway

Prepared by Rowan Williams Davies & Irwin, Inc.

2003

R363.7392 ROW

 

Red Hill Creek Expressway, North-South section: pre-construction ambient air quality monitoring

Prepared by Rowan Williams Davies & Irwin, Inc.

2003

R363.7392 ROW

 

Red Hill Creek Expressway: contaminated sites impact assessment

Prepared by Dillon Consulting

2003

R363.7396 DIL

 

Predicted increases in respirable particulate matter (PM), NO2, CO2, and VOC near the Red Hill Valley Expressway: possible human health effects from exposure: prepared for the City of Hamilton

Prepared by Cantox Environmental Inc.

2003

R363.7387 CAN

 

Noise assessment (QEW section)

Ontario Ministry of Transport

2003

R388.40971352 NOI

 

Impact assessment and design process surface water and stormwater quality technical report: prepared for the City of Hamilton

Prepared by Philips Engineering Ltd.

2003

R553.790971352 PHI

 

Hydrogeologic inventory and impact assessment

Prepared by Blackport and Associates

2003

R553.790971352 BLA

 

Fisheries and the Red Hill Creek realignment study: prepared for the City of Hamilton

Prepared by C. Portt and Associates

2003

R333.95616C

 

Final terrestrial resources technical report. Prepared for the City of Hamilton

Prepared by Dougan & Associates

2003

R333.70971352 DOU

 

Escarpment crossing visual assessment: prepared for Regional Municipality of Hamilton-Wentworth

Prepared by Hough Woodland Naylor Dance Leinster

2003

R388.40971352 HOU

 

Economic impact to business at QEW interchange

Prepared by C.N. Watdon and Associates Ltd.

2003

R388.40971352 C

 

Cultural heritage resource assessment: prepared for the City of Hamilton

Prepared by Archaeological Resources Inc.: Unterman, McPhail, Cuming Associates; in association with Historica Research Ltd.

2003

R363.690971352 ARC

 

City of Hamilton southern flying squirrel study: prepared for the City of Hamilton

By Ewa Bednarczuk and Kevin Judge

2003

R599.369 BED

 

Red Hill Valley Archives [electronic resource]: July 31, 2004

Hamilton,Ont.: Friends of Red Hill Valley, 2004

CDROM

 

333.720971352 RED (Central Library CD ROM collection)