The accessible washroom in both the Waterdown library and the lobby of the Waterdown shared facility are out of order. We aim to get it fixed quickly.
In preparation for the 1st Floor renovations, the Sherwood Branch will be closed on Wednesday, May 14. It is expected to reopen on Thursday, May 15 with the completion of the basement renovation. Thank you for your understanding.
Due to City IT maintenance, there may be an intermittent network outage between 8-10 pm during Study Hall on Thursday, May 8. Computers, printers and WiFi may not be available at times. Thank you for your patience.
All HPL Branches are closed on Sunday, May 18, and Victoria Day, Monday, May 19. Bookmobile is off the road. Extended Access and Study Hall services are not available. Our Virtual Branch is open at hpl.ca.
On Tuesday, May 13, a fire drill will be held at 11 am at Central Library. You may visit the Barton or Locke Branches as alternate locations for your library needs. Thank you for your understanding.
Due to the ongoing roof repair project, noise and parking disruptions are expected to continue until the end of June. Thank you for your patience.
From Monday, May 5 to Saturday, May 31, the Ancaster Branch will be temporarily closed due to a roof and HVAC replacement. During this time, service hours will be available at the Ancaster Rotary Centre, 385 Jerseyville Road West, Ancaster. The last day to pick up your Holds is Thursday, May 1st. Thank you for your understanding.
The digital microfilm machines at Central Library are not working. A single analog machine is available, but it doesn't print. We aim to have the digital devices repaired as soon as possible. We apologize for the inconvenience.
Please be aware of online phishing attempts impersonating Hamilton Public Library and Library Staff. HPL does not solicit paid freelance opportunities through social media or other messaging applications. HPL does not request personal or banking information through social media or require financial compensation when reviewing job applications. Please report phishing schemes to communications@hpl.ca. If you think you are a victim of fraud, please call the Canadian Anti-Fraud Centre at 1-888-495-8501.
The first phase of renovations continues at the Sherwood Branch. During this time, noise disruptions may occur throughout the branch due to a basement renovation. Parking, access to the building, and collections will not be affected. Thank you for your patience. www.hpl.ca/sherwood
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH