Terryberry Branch Entrance Out of Order

The sliding door at Terryberry Branch is not working properly. Please use accessible ramp entrance.

1
Published:
Saturday, October 11, 2025 - 12:00pm
Online Resources and Guest WiFi Access - October 12 -13

Due to network maintenance, online resources and Guest Wi-Fi will not be available from 6 am Sunday, October 12 to 7 am Monday, October 13. Thank you for your patience.

All Branches and Bookmobile Stops
Published:
Tuesday, October 7, 2025 - 2:30pm
Delayed Branch Openings 

The following locations have upcoming delayed openings due to Staff training drills. 

Monday, October 20 
Ancaster Branch, 10 am 

Tuesday, October 21 
Central Library, 10 am 
Sherwood Branch, 10 am 

Thursday, October 23
Locke Branch, 10am

You may visit nearby Branches for your library needs. www.hpl.ca/hours

 

All Branches and Bookmobile Stops
Published:
Tuesday, October 7, 2025 - 2:00pm
Branch Closures - Thanksgiving

All HPL Branches are closed on Thanksgiving Monday, October 13. Bookmobile is off the road. Extended Access and Study Hall services are not available. Regular service hours resume on Tuesday, October 14. Our Virtual Branch is open at hpl.ca.

All Branches and Bookmobile Stops
Published:
Monday, October 6, 2025 - 2:00pm
All Branches Closed for October 12

All branches close on Sunday, October 12, 2025 for Thanksgiving. This includes branches with Extended Access.

All Branches and Bookmobile Stops
Published:
Monday, October 6, 2025 - 2:00pm
Interlibrary Loan Service on Pause

Interlibrary Loan (ILLO) service will be temporarily paused starting Friday, September 26, due to continued negotiations between CUPW and Canada Post. We apologize for the inconvenience.

All Branches and Bookmobile Stops
Published:
Friday, September 26, 2025 - 1:00pm
Replacement and Damage Fees

Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items. 

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 20)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 20. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1976-1979

Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study

Deleus Cather, Canada Ltd.

February 1978

R388.40971352 STU CESH

 

Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection

The Regional Municipality of Hamilton-Wentworth

July 1978

R388.40971352 HAM CESH Vol. 1

 

Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise

S.M. Taylor, S. Birnie, and F.L. Hall

Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada

Environment and Planning A, volume 10, pages 1377-1386

1978

CA3ONHWAO5 84 B1637

 

The effects of the Upper Ottawa street landfill on Redhill Creek

Ontario. Water Resources Assessment. Technical Support

Ministry of the Environment

1978

R628.1686713 On8 CESH

 

Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4

The Regional Municipality of Hamilton-Wentworth

January 1979

R388.40971352 HAM Vol. 2 CESH

 

Floodplain Analysis Red Hill Creek Valley

March 1979

R627.40971352 FLO CESH

 

Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation

May 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission

Regional Engineering Dept.

1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility

July 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council

July 18, 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4

The Regional Municipality of Hamilton-Wentworth

August 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives

Hamilton-Wentworth Regional Municipal Council

1979

CA3ONHWAO5 79 M52

 

Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee

Ministry of Transportation and Communications

1979

R388.40971352 RED CESH