Study Halls Return September 2

Study Halls at Central Library and Dundas, Red Hill, Terryberry, Turner Park, Valley Park, and Waterdown branches resume on Tuesday, September 2. They will be open after-hours Mondays-Thursdays from 8 pm to Midnight. www.hpl.ca/study-halls 

All Branches and Bookmobile Stops
Published:
Wednesday, August 27, 2025 - 2:15pm
Bookmobile Stop Modified

Due to campus events, McMaster University's Bookmobile Visits for Tuesdays, August 26 and September 2 (3:30-4:30 pm) have been cancelled. Service is expected to resume on Tuesday, September 9. Thank you for your understanding.

1
Affected Branch: Bookmobile
Nearest Branches: 
Bookmobile Stop: 
Published:
Tuesday, August 26, 2025 - 12:00pm
Carlisle Branch Accessible Door Out of Order

The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.

1
Affected Branch: Carlisle Branch
Published:
Tuesday, August 26, 2025 - 10:15am
Turner Park - Rymal Road Entrance Unavailable

Due to continued concrete work, the Rymal Road entrance will be unavailable until Friday, August 30. Access to the parking lot, accessible parking spaces, back entrance, and external drop box is available. Thank you for your patience.

Published:
Wednesday, August 20, 2025 - 2:30pm
Labour Day Closure

All HPL Branches are closed on Sunday, August 31, and Labour Day, Monday, September 1st. Bookmobile is off the road, and Extended Access is not available. Regular service hours resume Tuesday, September 2. www.hpl.ca/hours

All Branches and Bookmobile Stops
Published:
Tuesday, August 19, 2025 - 8:00am
Turner Park - Mid-Day Fire Drill, September 3

Due to a mid-day fire drill, Turner Park Branch and Les Chater Family YMCA are closed for a fire drill from noon-1 pm. Thank you for your patience.

Published:
Thursday, August 14, 2025 - 1:00pm
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 10)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1976-1979

Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study

Deleus Cather, Canada Ltd.

February 1978

R388.40971352 STU CESH

 

Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection

The Regional Municipality of Hamilton-Wentworth

July 1978

R388.40971352 HAM CESH Vol. 1

 

Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise

S.M. Taylor, S. Birnie, and F.L. Hall

Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada

Environment and Planning A, volume 10, pages 1377-1386

1978

CA3ONHWAO5 84 B1637

 

The effects of the Upper Ottawa street landfill on Redhill Creek

Ontario. Water Resources Assessment. Technical Support

Ministry of the Environment

1978

R628.1686713 On8 CESH

 

Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4

The Regional Municipality of Hamilton-Wentworth

January 1979

R388.40971352 HAM Vol. 2 CESH

 

Floodplain Analysis Red Hill Creek Valley

March 1979

R627.40971352 FLO CESH

 

Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation

May 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission

Regional Engineering Dept.

1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility

July 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council

July 18, 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4

The Regional Municipality of Hamilton-Wentworth

August 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives

Hamilton-Wentworth Regional Municipal Council

1979

CA3ONHWAO5 79 M52

 

Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee

Ministry of Transportation and Communications

1979

R388.40971352 RED CESH