The sliding door at Terryberry Branch is not working properly. Please use accessible ramp entrance.
Due to network maintenance, online resources and Guest Wi-Fi will not be available from 6 am Sunday, October 12 to 7 am Monday, October 13. Thank you for your patience.
The following locations have upcoming delayed openings due to Staff training drills.
Monday, October 20
Ancaster Branch, 10 am
Tuesday, October 21
Central Library, 10 am
Sherwood Branch, 10 am
Thursday, October 23
Locke Branch, 10am
You may visit nearby Branches for your library needs. www.hpl.ca/hours
All HPL Branches are closed on Thanksgiving Monday, October 13. Bookmobile is off the road. Extended Access and Study Hall services are not available. Regular service hours resume on Tuesday, October 14. Our Virtual Branch is open at hpl.ca.
All branches close on Sunday, October 12, 2025 for Thanksgiving. This includes branches with Extended Access.
Interlibrary Loan (ILLO) service will be temporarily paused starting Friday, September 26, due to continued negotiations between CUPW and Canada Post. We apologize for the inconvenience.
Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items.
Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 20. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. Thank you for your patience.
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH