Study Halls at Central Library and Dundas, Red Hill, Terryberry, Turner Park, Valley Park, and Waterdown branches resume on Tuesday, September 2. They will be open after-hours Mondays-Thursdays from 8 pm to Midnight. www.hpl.ca/study-halls
Due to campus events, McMaster University's Bookmobile Visits for Tuesdays, August 26 and September 2 (3:30-4:30 pm) have been cancelled. Service is expected to resume on Tuesday, September 9. Thank you for your understanding.
The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.
Due to continued concrete work, the Rymal Road entrance will be unavailable until Friday, August 30. Access to the parking lot, accessible parking spaces, back entrance, and external drop box is available. Thank you for your patience.
All HPL Branches are closed on Sunday, August 31, and Labour Day, Monday, September 1st. Bookmobile is off the road, and Extended Access is not available. Regular service hours resume Tuesday, September 2. www.hpl.ca/hours
Due to a mid-day fire drill, Turner Park Branch and Les Chater Family YMCA are closed for a fire drill from noon-1 pm. Thank you for your patience.
Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH