The accessible washroom in both the Waterdown library and the lobby of the Waterdown shared facility are out of order. We aim to get it fixed quickly.
In preparation for the 1st Floor renovations, the Sherwood Branch will be closed on Wednesday, May 14. It is expected to reopen on Thursday, May 15 with the completion of the basement renovation. Thank you for your understanding.
Due to City IT maintenance, there may be an intermittent network outage between 8-10 pm during Study Hall on Thursday, May 8. Computers, printers and WiFi may not be available at times. Thank you for your patience.
All HPL Branches are closed on Sunday, May 18, and Victoria Day, Monday, May 19. Bookmobile is off the road. Extended Access and Study Hall services are not available. Our Virtual Branch is open at hpl.ca.
On Tuesday, May 13, a fire drill will be held at 11 am at Central Library. You may visit the Barton or Locke Branches as alternate locations for your library needs. Thank you for your understanding.
Due to the ongoing roof repair project, noise and parking disruptions are expected to continue until the end of June. Thank you for your patience.
From Monday, May 5 to Saturday, May 31, the Ancaster Branch will be temporarily closed due to a roof and HVAC replacement. During this time, service hours will be available at the Ancaster Rotary Centre, 385 Jerseyville Road West, Ancaster. The last day to pick up your Holds is Thursday, May 1st. Thank you for your understanding.
The digital microfilm machines at Central Library are not working. A single analog machine is available, but it doesn't print. We aim to have the digital devices repaired as soon as possible. We apologize for the inconvenience.
Please be aware of online phishing attempts impersonating Hamilton Public Library and Library Staff. HPL does not solicit paid freelance opportunities through social media or other messaging applications. HPL does not request personal or banking information through social media or require financial compensation when reviewing job applications. Please report phishing schemes to communications@hpl.ca. If you think you are a victim of fraud, please call the Canadian Anti-Fraud Centre at 1-888-495-8501.
The first phase of renovations continues at the Sherwood Branch. During this time, noise disruptions may occur throughout the branch due to a basement renovation. Parking, access to the building, and collections will not be affected. Thank you for your patience. www.hpl.ca/sherwood
Red Hill Creek Expressway Books: 1997
Red Hill Creek Watershed Plan: surface water report
Regional Municipality of Hamilton-Wentworth
July 1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion
Regional Municipality of Hamilton-Wentworth
July 10, 1997
CA3ONHWAO5 97 R263D
Red Hill Creek Watershed Plan: Water Quality Report
Regional Municipality of Hamilton-Wentworth
August 1997
CA3ONHWAO5 97 R232
Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel
Red Hill Creek Expressway Review Panel
November 1997
CA1EA99 RM4
Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources
Regional Municipality of Hamilton-Wentworth
December 11, 1997
CA3ONHWAO5 97 R236
Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project
CSW Productions
1997
R333.7209713 ALI (2nd floor)
A fluvial geomorphologic assessment of Red Hill Creek and its tributaries
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.4420971352 FLU CESH
CA3ONHWAO5 97 R43
Red Hill Creek Expressway: North South Section: Community Stakeholders Committee
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 C57
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R241D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R239D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R240D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R243D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 F242D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R238D
Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Expressway: North South section: Information Brief
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 I51
Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231D
The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231
Red Hill Creek watershed plan: hydrogeological inventory
Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.
1997
R553.790971352 TER CESH
CA3ONHWAO5 97 R237
Red Hill Creek Watershed Plan Study: Soils and Geology
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R235
Red Hill Creek Watershed Plan: Surface Water Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232
Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234D
Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234
Soils and geology: Red Hill Creek watershed plan study
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.700971352 SOI CESH
State of the Watershed report: Red Hill Creek Watershed Planning
Regional Municipality of Hamilton-Wentworth
1997
R333.70971352 STA CESH
Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R244D