Magazine and ILLO Delay
Magazine and ILLO deliveries are delayed due to the Canadian Union of Postal Workers (CUPW) strike. Thank you for your understanding.
City IT Planned Maintenance
A City IT systems update is scheduled for early Saturday morning. This will impact access to HPL's network and some applications. This update will improve overall network capacity, performance, resiliency, reliability and is the foundation for future network updates. Thank you for your patience.
3D Printing Not Available On Sundays
Please note that 3D printing services are unavailable on Sundays. We apologize for any inconvenience.
Early Closure - All HPL Branches, Friday, November 22
Due to a special event, all HPL branches will close at 4 pm on Friday, November 22.
Central Library's 4th Floor will be closed all day except for the Newcomer Learning Centre and Makerspace which will be open until 4 pm.
Regular service hours resume on Saturday, November 23.
Thank you for your understanding.
Delayed Branch Openings
Due to Staff training, the following branches have delayed openings of 10 am on:
Tuesday, November 19: Concession
Wednesday, November 20: Ancaster (2 pm opening)
Thursday, November 21: Valley Park
Please visit nearby branches for your library needs. www.hpl.ca/hours
Kenilworth Branch - Roof Repairs
From November 11 to 29, the parking lot may not be available at certain times of the day due to repair maintenance. There may also be some noise disruptions in the branch. Thank you for your understanding.
Red Hill Creek Expressway Books: 1997
Red Hill Creek Watershed Plan: surface water report
Regional Municipality of Hamilton-Wentworth
July 1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion
Regional Municipality of Hamilton-Wentworth
July 10, 1997
CA3ONHWAO5 97 R263D
Red Hill Creek Watershed Plan: Water Quality Report
Regional Municipality of Hamilton-Wentworth
August 1997
CA3ONHWAO5 97 R232
Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel
Red Hill Creek Expressway Review Panel
November 1997
CA1EA99 RM4
Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources
Regional Municipality of Hamilton-Wentworth
December 11, 1997
CA3ONHWAO5 97 R236
Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project
CSW Productions
1997
R333.7209713 ALI (2nd floor)
A fluvial geomorphologic assessment of Red Hill Creek and its tributaries
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.4420971352 FLU CESH
CA3ONHWAO5 97 R43
Red Hill Creek Expressway: North South Section: Community Stakeholders Committee
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 C57
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R241D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R239D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R240D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R243D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 F242D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R238D
Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Expressway: North South section: Information Brief
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 I51
Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231D
The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231
Red Hill Creek watershed plan: hydrogeological inventory
Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.
1997
R553.790971352 TER CESH
CA3ONHWAO5 97 R237
Red Hill Creek Watershed Plan Study: Soils and Geology
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R235
Red Hill Creek Watershed Plan: Surface Water Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232
Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234D
Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234
Soils and geology: Red Hill Creek watershed plan study
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.700971352 SOI CESH
State of the Watershed report: Red Hill Creek Watershed Planning
Regional Municipality of Hamilton-Wentworth
1997
R333.70971352 STA CESH
Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R244D