Study Halls Return September 2

Study Halls at Central Library and Dundas, Red Hill, Terryberry, Turner Park, Valley Park, and Waterdown branches resume on Tuesday, September 2. They will be open after-hours Mondays-Thursdays from 8 pm to Midnight. www.hpl.ca/study-halls 

All Branches and Bookmobile Stops
Published:
Wednesday, August 27, 2025 - 2:15pm
Bookmobile Stop Modified

Due to campus events, McMaster University's Bookmobile Visits for Tuesdays, August 26 and September 2 (3:30-4:30 pm) have been cancelled. Service is expected to resume on Tuesday, September 9. Thank you for your understanding.

1
Affected Branch: Bookmobile
Nearest Branches: 
Bookmobile Stop: 
Published:
Tuesday, August 26, 2025 - 12:00pm
Carlisle Branch Accessible Door Out of Order

The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.

1
Affected Branch: Carlisle Branch
Published:
Tuesday, August 26, 2025 - 10:15am
Turner Park - Rymal Road Entrance Unavailable

Due to continued concrete work, the Rymal Road entrance will be unavailable until Friday, August 30. Access to the parking lot, accessible parking spaces, back entrance, and external drop box is available. Thank you for your patience.

Published:
Wednesday, August 20, 2025 - 2:30pm
Labour Day Closure

All HPL Branches are closed on Sunday, August 31, and Labour Day, Monday, September 1st. Bookmobile is off the road, and Extended Access is not available. Regular service hours resume Tuesday, September 2. www.hpl.ca/hours

All Branches and Bookmobile Stops
Published:
Tuesday, August 19, 2025 - 8:00am
Turner Park - Mid-Day Fire Drill, September 3

Due to a mid-day fire drill, Turner Park Branch and Les Chater Family YMCA are closed for a fire drill from noon-1 pm. Thank you for your patience.

Published:
Thursday, August 14, 2025 - 1:00pm
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 10)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1997

Red Hill Creek Watershed Plan: surface water report

Regional Municipality of Hamilton-Wentworth

July 1997

CA3ONHWAO5 97 R233

 

Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion

Regional Municipality of Hamilton-Wentworth

July 10, 1997

CA3ONHWAO5 97 R263D

 

Red Hill Creek Watershed Plan: Water Quality Report

Regional Municipality of Hamilton-Wentworth

August 1997

CA3ONHWAO5 97 R232

 

Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel

Red Hill Creek Expressway Review Panel

November 1997

CA1EA99 RM4

 

Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources

Regional Municipality of Hamilton-Wentworth

December 11, 1997

CA3ONHWAO5 97 R236

 

Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project

CSW Productions

1997

R333.7209713 ALI (2nd floor)

 

A fluvial geomorphologic assessment of Red Hill Creek and its tributaries

Regional Municipality of Hamilton-Wentworth. Special Projects Office

1997?

R551.4420971352 FLU CESH

CA3ONHWAO5 97 R43

 

Red Hill Creek Expressway: North South Section: Community Stakeholders Committee

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 C57

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R241D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R239D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R240D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R243D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 F242D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R238D

 

Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232D

 

Red Hill Creek Expressway: North South section: Information Brief

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 I51

 

Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R231D

 

The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R231

 

Red Hill Creek watershed plan: hydrogeological inventory

Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.

1997

R553.790971352 TER CESH

CA3ONHWAO5 97 R237

 

Red Hill Creek Watershed Plan Study: Soils and Geology

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R235

 

Red Hill Creek Watershed Plan: Surface Water Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R233

 

Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232D

 

Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232

 

Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R234D

 

Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R234

 

Soils and geology: Red Hill Creek watershed plan study

Regional Municipality of Hamilton-Wentworth. Special Projects Office

1997?

R551.700971352 SOI CESH

 

State of the Watershed report: Red Hill Creek Watershed Planning

Regional Municipality of Hamilton-Wentworth

1997

R333.70971352 STA CESH

 

Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R244D