Due to filming in the area, there will be production vehicles and various pieces of film equipment located on:
East side of Bay Street between King Street West and York Blvd.
South side King Street East between McNabb and Bay Streets
Due to filming in the area, there will be production vehicles and various pieces of film equipment located on:
East side of Bay Street between King Street West and York Blvd.
South side King Street East between McNabb and Bay Streets
The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.
Due to exterior pavement construction, the Study Hall (8pm-Midnight) on Thursday, April 16 is cancelled. Study Hall service resumes on Monday, April 20.
The back parking lot will not be accessible from 10 pm on April 16 to 10 pm on Friday, April 17. Thank you for your understanding.
Please note that there is higher than usual noise levels and odors due to renovations taking place this week. Thank you in advance for your patience.
The accessible washroom on the 1st floor at Terryberry Branch is not working. We aim to get it fixed quickly.
Due to Staff training, Mount Hope Branch will have a delayed opening of 2 pm on Monday, May 4. You may visit Turner Park Branch as the next nearest location for your library needs. Thank you for your patience.
The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Wednesday, April 15
Thursday, April 16
Tuesday, April 21
Friday, April 24
Tuesday, April 28
Wednesday, April 29
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Red Hill Creek Expressway: north-south section: briefing sessions April 1, 1998 : stormwater management and creek realignment
Video
1998
Sherwood Library
Red Hill Creek Expressway: north-service section: briefing sessions April 7, 1998: site contamination and vegetation/wildlife
Video
1998
Sherwood Library
Red Hill Creek Watershed Action Plan: first generation plan: final draft
Regional Municipality of Hamilton-Wentworth
April 1998
CA3ONHWAO5 98 R246
Red Hill Creek Watershed Action Plan: compendium of actions
Regional Municipality of Hamilton-Wentworth
April 1998
CA3ONHWAO5 98 R245
Red Hill Creek Expressway North-South Section: impact assessment and design process: draft summary report: Vol. 2
Regional Municipality of Hamilton-Wentworth
July 1998
CA3ONHWAO5 98 R231
Air quality assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T33D
From Mountain to lake: the Red Hill Creek Valley
edited by Walter G. Peace
Conserver Society of Hamilton and District
1998
R971.352 FRO CESH
Red Hill Creek Expressway: Phase 1 Environmental Site Assessment: draft for discussion
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R244D
Red Hill Creek Expressway: Phase 2 Environmental Investigation: draft for discussion
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R245D
Red Hill Creek Expressway North-South Section: Executive Summary
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R250E
Red Hill Creek Expressway Impact Assessment: Terrestrial Resources: Technical Report
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R246
The Red Hill Creek Expressway (North-South Section) Impact Assessment: Regional Municipality of Hamilton-Wentworth, Ontario: Summary Report of the Cultural heritage Resource Assessment
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R247
Red Hill Creek Expressway (North-South Section) and Q.E.W. interchanges (Red Hill Creek Expressway and Burlington Street
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R23E
Red Hill Creek Expressway / QEW interchange review: integration model - traffic operations analysis
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 R23Q
Thermal dynamics impact assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T32D
Traffic noise impact assessment Red Hill Creek Expressway North-South Section: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T34D
Vehicle air emissions inventory North-South Section: Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 V35D