Central Library - Children's Washroom and Nursing Room Out of Order
Due to maintenance, the 1st Floor Children's Washroom and Nursing Room are out of order today and tomorrow, Friday, November 1st. Washrooms are accessible on Floors 2-4. We apologize for the inconvenience.
Sherwood Branch - Elevator Out of Service
The elevator is currently out of order. Estimated time of disruption is unknown. Thank you for your patience.
Sherwood Branch Elevator is Out of Service
The Sherwood Library Elevator for our program area is currently out of service. We are working with facilities staff to restore service as soon as possible.
History of Gore Park
Other things were happening to the park during the 1950s besides the bird menace. The old fountain installed for the Royal visit in 1860 was finally condemned as unsafe and removed to make way for the three saucer shaped fountains donated by the Kinsmen (48). The flagpole, having been condemned as unsafe, was replaced by a steel one donated to the city by Dofasco.
The 1960s got off to a roaring start with the dedication of the new $20,000 fountains. Prime Minister Diefenbaker was scheduled to come to the ceremony but a blizzard kept him grounded in Ottawa. The Honourable Ellen Fairclough stood in his place (49). During this time period it was decided that Gore Park needed a master plan for a complete change. The Parks Board decided to set up a permanent committee to look into the question. Five committees, four reports and five years after talks commenced in 1962 they were no closer to any acceptable designs for renovation than they had been at the beginning.
The Parks Board presented their latest proposal in April 1968. It called for replacing the Kinsmen's fountain with a 150 foot long reflecting pool with three spray fountains, planting more flowers, closing Hughson Street through the park and putting a steel picket fence around the park. The final version of that report, presented 12 months later, left Hughson Street open but retained all the other suggestions. The only problem now facing the Board was the fact that there was absolutely no money to do anything proposed. They hoped the money would be available in two years time (50).
The renovations were finally budgeted for and slated to start in the summer of 1970. The central focus of the new park would be the new fountain. It was to be an oval with a twenty-five foot spray in the middle and about 25 other smaller jets around it. All benches were to be removed and seats without backs placed at intervals. $135,000 was budgeted for the renovations (51). The fountain was officially turned on October 23, 1970 and worked beautifully. The coloured lights playing on it made quite an impressive sight.